- Start
- Second Annual Report of the Metropolitan Water Board
Second Annual Report of the Metropolitan Water Board
Angebote / Angebote:
Excerpt from Second Annual Report of the Metropolitan Water Board: January 1, 1896
Two main lines Of 48-inch cast-iron pipes are projected to be laid from the Chestnut Hill Reservoir to Spot Pond, which is to be used as a storage and distributing reservoir for the city of Boston and other lower portions of the Metropolitan Water District. Pipes 48 inches in diameter and pipes of lesser dimensions are also to be laid to connect with the various cities and towns in the Metropolitan District.
About the Publisher
Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com
This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully, any imperfections that remain are intentionally left to preserve the state of such historical works.
Folgt in ca. 5 Arbeitstagen